Attention before operation of pulse dust collector
Before the operation of the pulse dust collector, the staff should check all aspects of the inside of the pulse dust collector, whether the reducer is flexible and lubricated, check the operation of the ash hopper discharge equipment, and ensure the normal operation of these accessories;
Check whether the ash unloading device and the ash conveying device are operating normally;
The place where the dust collector is installed should be cleaned up, the roads, all operation inspection platforms, walkway handrails are complete, and the lighting is sufficient, there are shields or baffles outside each rotating mechanism, and the control room should have cooling, dust and fire prevention measures;
After the dust bag is installed, check the bottom of the cloth bag and the shell, the cloth bag and the partition plate, and the cloth bags, and they should not touch each other.